Skip links

[two_fifth][wooslider slide_page=”marnage” slider_type=”slides” limit=”5″][/two_fifth] [three_fifth_last]

Tidal range

This device makes it possible to moor a boom on a dock while allowing it to follow water height changes due to tidal phenomenon.

[button onclick=”ga(‘send’, ‘event’, ‘barrages-anti-pollution’, ‘Clic-devis’, ‘Devis marnage-barrage’);” link=”https://bhd-environnement.com/contact/” size=”medium” color=”red” style=”light” lightbox=”false” iconbox=”edit”]Contact us[/button]

[/three_fifth_last]
TIDAL RANGE ON CABLE : The tidal range system consists of:
· 2 Tidal range turntables to be fitted on the dock;
· 1 Galvanised steel cable (stainless steel optional) clamped at each end;
· 1 Turnbuckle clevis in galvanised steel (stainless steel optional);
· 1 Tidal range plate in galvanised steel (stainless steel optional);
· 1 float to ensure proper floatation of the tidal range system;
· 2 HR shackles in galvanised steel (stainless steel optional);
· 2 or 3 quick opening hooks to connect the tidal range bar and cable.
[button onclick=”ga(‘send’, ‘event’, ‘barrages-anti-pollution’, ‘Clic-telechargement’, ‘PDF marnage-cable’);” link=”https://bhd-environnement.com/wp-content/uploads/2014/10/FICHE-TECHNIQUE-Marnage-sur-câble.pdf” size=”medium” color=”red” style=”light” lightbox=”false” iconbox=”pdf”]Download PDF[/button]

TIDAL RANGE ON RUNNERS : The tidal range system consists of:
· 1 tubular tidal range runner in 316 stainless steel with fixation points for M16 threaded rod and 2 clip pins (high and low tidal range levels).
· 1 tidal range bar in 316 stainless steel the size of the boom for single or double anchoring depending on the implantation site. Weight under 20 kg.
· 1 boom connection element mounted on the tidal range bar
· 1 compensation float whose role is to ensure proper flotation of the tidal range bar.
[button onclick=”ga(‘send’, ‘event’, ‘barrages-anti-pollution’, ‘Clic-telechargement’, ‘PDF marnage-coulisse’);” link=”https://bhd-environnement.com/wp-content/uploads/2014/10/FICHE-TECHNIQUE-Marnage-sur-coulisse.pdf” size=”medium” color=”red” style=”light” lightbox=”false” iconbox=”pdf”]Download PDF[/button]

[hr style=”3″ margin=”20px 0 40px”]

Other accessories for the set-up of oil spill booms:

[one_third]
[teaser img=”https://bhd-environnement.com/wp-content/uploads/2013/12/Motopompe.jpg”]

MOTOR-DRIVEN PUMP

[button link=”https://bhd-environnement.com/motopompe/” size=”small” icon=”share-alt” color=”alternative-1″]Read more[/button]
[/teaser]
[/one_third]
[one_third]
[teaser img=”https://bhd-environnement.com/wp-content/uploads/2013/12/Barre-de-traction.jpg”]

DRAWBAR

[button link=”https://bhd-environnement.com/barre-traction-remorquage/” size=”small” icon=”share-alt” color=”alternative-1″]Read more[/button]
[/teaser]
[/one_third]
[one_third_last][teaser img=”https://bhd-environnement.com/wp-content/uploads/2013/12/Ancrage-pour-barrage.jpg”]

Anchor

[button link=”https://bhd-environnement.com/ancrage-barrage/” size=”small” icon=”share-alt” color=”alternative-1″]Read more[/button]
[/teaser][/one_third_last]